Every entry is citable. Press “Cite this entry” for a Chinese footnote, Chinese bibliography, APA or Chicago note — all derived from the registered source and the generated archive, never hand-written. If a registered source has no publication year, the citation prints the access date and says so.
冇 JavaScript 都用得:來源書目模板 / Source patterns (no JavaScript needed)
《香港志·自然》自然環境 Hong Kong Chronicles, Nature: Natural Environment
APAHong Kong Chronicles Institute. Hong Kong Chronicles, Nature: Environmental Protection and Conservation (p. 〈頁碼〉). Accessed 2026-10-18. /chronicle/archive/2007#〈條目編號〉
《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事) Hong Kong Chronicles: Overview and Chronology (c. 5000 BC–2017, over 6,500 events)
APAHong Kong Chronicles Institute (2020). Hong Kong Chronicles: Overview and Chronology (c. 5000 BC–2017, over 6,500 events) (p. 〈頁碼〉). /chronicle/archive/2007#〈條目編號〉
Substitute the entry’s page number and ID (shown as 〈頁碼〉/〈條目編號〉) into the pattern above. The same templates, plus rules and limits, are in the citation block of /api/v1/archive.json.
In August 2007, the Observatory installed a new satellite reception system at its headquarters to receive the new broadcast format data and imagery transmitted by MTSAT-1R.
來源 《香港志·自然》自然環境(香港地方志中心) · p.279
tech
2007-08 · 香港 · 日期僅記到月份
該消毒設施的環評報告在2007年8月至9月開放予公眾查閱,期間接獲兩份意見,最終於同年11月獲批。
The environmental impact assessment report of the disinfection facility was open for public inspection from August to September 2007, during which two submissions were received, and it was approved in November of the same year.
On 1 August 2007, in response to the Central Reclamation Phase III project, the Government of the Hong Kong Special Administrative Region announced the resumption of the government land on which Queen's Pier stood and the demolition of the pier, which had a history of 82 years.
On 2 August 2007, the Hong Kong Special Administrative Region Government announced that the Hong Kong section of the Guangzhou-Shenzhen-Hong Kong Express Rail Link would be built with a dedicated corridor and dedicated tracks running from the West Kowloon Terminus to the Shenzhen-Hong Kong boundary, shortening the journey time between Hong Kong and Guangzhou.
On 8 August 2007, bar-bending workers went on strike for a pay rise; on the 12th of the same month labour and management reached a consensus, with the daily wage raised to $860 and working hours reduced to eight, ending the 36-day industrial action.
On 10 August 2007, the High Court delivered its judgment in the judicial review arising from Queen's Pier not being included as a declared monument, ruling that the decision made by the Antiquities Authority was lawful.
On 15 August 2007, the KCR Lok Ma Chau Spur Line and the Futian Port began operation, with a total length of 7.4 km, connecting Sheung Shui with Futian Port at Lok Ma Chau and becoming the second cross-boundary railway between Shenzhen and Hong Kong.