1955 · 新界及離島 · 日期僅記到年份
1955年南約理民府坪洲有875戶,青衣有196戶,蒲台島有40戶。
In 1955, the South District Office recorded 875 households on Peng Chau, 196 on Tsing Yi, and 40 on Po Toi Island.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.697
Tsing Yi · Twentieth century
呢一頁係「青衣」呢條軸嘅二十世紀,共 98 條條目(公元 1955 至 1999-08-24)。 逐條附第一官方來源、原書頁碼同「引用呢條」。
98 archive entries for the Twentieth century of this entity axis, each with its primary official source and archive page number.
條目點樣揀、有咩已知缺口、相關統計同口徑提示,一律喺軸頁交代;呢一頁只列原文條目本身,唔會新增或者改寫任何事實。 同一批條目亦可能出現喺其他軸(志錄一條條目可以同時提到幾個地方),各軸各自完整。
引用每條都可以引用:按條目下面嘅「引用呢條」,可以揀中文腳註/中文參考書目/APA/Chicago 四種格式並複製。 書名、出版者、年份同頁碼一律由已登記來源同生成檔派生,頁面一條都唔會手寫;年份取來源登記嘅出版年, 來源未登記出版年嘅,引文改用查閱日期並寫明。
Every entry is citable. Press “Cite this entry” for a Chinese footnote, Chinese bibliography, APA or Chicago note — all derived from the registered source and the generated archive, never hand-written. If a registered source has no publication year, the citation prints the access date and says so.
《香港志·自然》建置與地區概況(人口) Hong Kong Chronicles, Nature: Territory, Geography and Population
中文腳註香港地方志中心,《香港志·自然》建置與地區概況(人口)(查閱日期 2026-10-18),頁 〈頁碼〉,/chronicle/archive/1955#〈條目編號〉。
APAHong Kong Chronicles Institute. Hong Kong Chronicles, Nature: Territory, Geography and Population (p. 〈頁碼〉). Accessed 2026-10-18. /chronicle/archive/1955#〈條目編號〉
《香港志·自然》環境保護與生態保育 Hong Kong Chronicles, Nature: Environmental Protection and Conservation
中文腳註香港地方志中心,《香港志·自然》環境保護與生態保育(查閱日期 2026-10-18),頁 〈頁碼〉,/chronicle/archive/1960#〈條目編號〉。
APAHong Kong Chronicles Institute. Hong Kong Chronicles, Nature: Environmental Protection and Conservation (p. 〈頁碼〉). Accessed 2026-10-18. /chronicle/archive/1960#〈條目編號〉
《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事) Hong Kong Chronicles: Overview and Chronology (c. 5000 BC–2017, over 6,500 events)
中文腳註香港地方志中心,《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事),2020,頁 〈頁碼〉,/chronicle/archive/1969#〈條目編號〉。
APAHong Kong Chronicles Institute (2020). Hong Kong Chronicles: Overview and Chronology (c. 5000 BC–2017, over 6,500 events) (p. 〈頁碼〉). /chronicle/archive/1969#〈條目編號〉
《香港志·自然》自然環境 Hong Kong Chronicles, Nature: Natural Environment
中文腳註香港地方志中心,《香港志·自然》自然環境(查閱日期 2026-10-18),頁 〈頁碼〉,/chronicle/archive/1982#〈條目編號〉。
APAHong Kong Chronicles Institute. Hong Kong Chronicles, Nature: Natural Environment (p. 〈頁碼〉). Accessed 2026-10-18. /chronicle/archive/1982#〈條目編號〉
Substitute the entry’s page number and ID (shown as 〈頁碼〉/〈條目編號〉) into the pattern above. The same templates, plus rules and limits, are in the citation block of /api/v1/archive.json.
1955 · 新界及離島 · 日期僅記到年份
In 1955, the South District Office recorded 875 households on Peng Chau, 196 on Tsing Yi, and 40 on Po Toi Island.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.697
1957 · 荃灣區 · 日期僅記到年份
In 1957, the Tsuen Wan, Kwai Chung, Tsing Yi and Ma Wan areas were separated from the South District Office, and the government subsequently established the Tsuen Wan District Office.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.146
1958 · 荃灣 · 日期僅記到年份
The area under the jurisdiction of the Tsuen Wan District Office covered Tsuen Wan, Tsing Yi Island, Ma Wan, and the northeastern corner of Lantau Island.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.70
1960 · 青衣 · 日期僅記到年份
Shipbuilding facilities such as the United Dockyards were formerly concentrated at Lockhart Bay on Tsing Yi Island, located on the island's north and west coasts.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.125
1960 · 青衣 · 日期僅記到年份
Entering the 1960s, several local oil companies successively set up oil storage facilities on Tsing Yi Island.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1960 · 青衣 · 日期僅記到年份
During the same period, Tsing Yi concentrated heavy industries such as energy, chemicals, cement and shipbuilding.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.125
1960 · 青衣 · 日期僅記到年份
International companies such as Shell, ExxonMobil, and Sinopec formerly chose to set up oil depots in southern Tsing Yi Island, making the area a major concentration of oil depots in Hong Kong.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.125
1969-04-22 · 香港青衣
On 22 April 1969, the power station of Peninsula Electric Power Company Limited on Tsing Yi began official operation.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.362
1969-04-22 · 香港
The construction and operation of the Tsing Yi Power Station were jointly funded by China Light & Power and Standard Oil Company of California.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.362
1970 · 香港 · 日期僅記到年份
Hong Kong's environmental movement spanned the 1970s and 1980s, with demands including opposition to the Lamma Island oil refinery and the relocation of the Tsing Yi oil depot.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.491
1970 · 青衣 · 日期僅記到年份
In the 1970s, the Hong Kong Government included Tsing Yi within the Tsuen Wan New Town for development.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1974 · 青衣,葵涌 · 日期僅記到年份
In 1974, the Tsing Yi Bridge opened, connecting Tsing Yi and Kwai Chung.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.125
1976-02-19 · 黃埔船塢及青衣船塢
On 19 February 1976, the Marine Department announced that the oil pollution situation was under control; thereafter, a vessel went to Whampoa Dock to unload its cargo and then moved to Tsing Yi Dock for repairs.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.506
引用名稱作品 Oriental Financier
1980 · 青衣 · 日期僅記到年份
Industrial activity in Kwai Tsing District contracted to the southwestern part of Tsing Yi Island.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.126
1980 · 香港 · 日期僅記到年份
Early examples of environmental planning can be seen in the mid-1980s Tseung Kwan O and Tin Shui Wai new town developments, as well as the rezoning of industrial land in Tsuen Wan and Tsing Yi.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.296
1981 · 荃灣 · 日期僅記到年份
In 1981, Tsuen Wan District accounted for 12.3% of Hong Kong's population, and Kwai Chung and Tsing Yi were also included within this district at that time.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.258
1981-12 · 青衣 · 日期僅記到月份
As of December 1981, there were six oil depots on Tsing Yi Island, operated by five oil companies.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1981-12 · 青衣 · 日期僅記到月份
The six oil depots were distributed as follows: one at Yau Yue Chau in the northeast, four in the southeast, and one in the southwest.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1982-04 · 青衣 · 日期僅記到月份
In April 1982, the Hong Kong Government commissioned a consultancy to assess the consequences of a fire or explosion at six oil depots and three chemical plants on Tsing Yi Island.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1982-08-18 · 青衣島南環
The waterspout there lifted no fewer than fourteen container boxes, each weighing about two tonnes, into the air and destroyed several roofs and temporary structures.
來源 《香港志·自然》自然環境(香港地方志中心) · p.717
1982-08-18 · 青衣島南環
On the morning of 18 August 1982, a waterspout formed around Nam Wan on Tsing Yi Island.
來源 《香港志·自然》自然環境(香港地方志中心) · p.717
1982-08-18 · 青衣島南灣
At 7:15 am on 18 August 1982, a waterspout formed at Nam Wan on Tsing Yi Island and lasted five minutes.
來源 《香港志·自然》自然環境(香港地方志中心) · p.304
1983-02 · 青衣 · 日期僅記到月份
The report proposed that the government should improve emergency service equipment and response plans, and establish arrangements for personnel evacuation.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1983-02 · 青衣 · 日期僅記到月份
The report mentioned that if the oil depot caught fire, some residents of Tsing Yi Island would suffer burns of varying severity, with severe cases possibly involving deep burns.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1983-02 · 青衣 · 日期僅記到月份
The study proposed strengthening risk reduction measures, including setting a cap on oil depot storage, and examining legislative amendments to regulate such facilities.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1983-02 · 青衣 · 日期僅記到月份
In February 1983, a consultancy firm submitted to the Hong Kong Government a study on potential hazards in Tsing Yi.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
引用名稱作品 《青衣潛在危險研究報告書》(Tsing Yi Potential Hazard Study Report)
1983-09 · 青衣 · 日期僅記到月份
In September 1983, a 9,300-tonne cargo ship struck the Mobil oil depot pier at Tsing Yi, damaging its oil unloading facilities.
來源 《香港志·自然》自然環境(香港地方志中心) · p.708
1984 · 青衣 · 8月23日
On 23 August, the Tsing Yi Rural Committee discussed hazardous industry on the island, stating that the proposed 140-metre buffer zone could not adequately protect residents' safety.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1984 · 青衣 · 8月20日
When attending a special meeting of the Tsuen Wan District Board on 20 August, the Secretary for Home Affairs stated that the Hong Kong Government had no intention at that stage of ordering the relocation of the oil depots on Tsing Yi Island.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1984 · 青衣 · 8月20日
The Secretary for Home Affairs stated that the Government would implement a number of measures to raise the safety level of Tsing Yi Island.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1984-03-06 · 青衣
On 6 March 1984, the Mobil oil depot caught fire, prompting residents' concern about the safety of the depot.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.542
1984-11 · 香港 · 日期僅記到月份
In November 1984, the Hong Kong Government announced that in the following year it would place advertisements locally and overseas to invite tenders for the construction of a toxic and chemical waste treatment plant, and would also identify a site, with Tuen Mun and Tsing Yi Island under consideration.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.545
1985 · 荃灣區 · 日期僅記到年份
In 1985, the Hong Kong Government split Kwai Chung and Tsing Yi Island from Tsuen Wan District to form the new Kwai Chung and Tsing Yi District.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.146
1985 · 荃灣 · 日期僅記到年份
In 1985, due to population growth in Tsuen Wan District, the Hong Kong government separated Tsing Yi Island and Kwai Chung to form Kwai Chung and Tsing Yi District, bringing the total number of districts to 19.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.76
1985 · 香港 · 日期僅記到年份
Kwai Chung and Tsing Yi District was separated from Tsuen Wan District of Hong Kong in 1985.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.259
1985 · 香港 · 日期僅記到年份
In 1985, Kwai Chung and Tsing Yi were separated from Tsuen Wan and established as a separate district.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.258
1985 · 葵涌,青衣 · 日期僅記到年份
In 1985, the Hong Kong government separated Tsing Yi Island and the area around Kwai Chung from Tsuen Wan District and established Kwai Chung and Tsing Yi District.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.126
1985-04-01 · 葵涌及青衣
Ho Tung-ching was elected Chairman of the Kwai Chung and Tsing Yi District Board, becoming the first person in Hong Kong to hold the post through election rather than government appointment.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.457
1985-04-01 · 葵涌及青衣
On 1 April 1985, the Kwai Chung and Tsing Yi District Board began operation, formed by splitting off from the Tsuen Wan District Board, bringing the total number of District Boards in Hong Kong to nineteen.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.457
1987 · 青衣島 · 日期僅記到年份
According to the annual report published by the Environmental Protection Department in 1987, the Land Development Policy Committee had approved the southeastern tip of Tsing Yi Island as a site for chemical waste treatment.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.545
1987-04 · 青衣 · 日期僅記到月份
In April 1987, an automatic weather station was established at Tsing Yi.
來源 《香港志·自然》自然環境(香港地方志中心) · p.255
1987-04-01 · 青柏樓(青衣)
On 1 April 1987, the automatic weather station at Tsing Pak House (Tsing Yi) commenced operation.
來源 《香港志·自然》自然環境(香港地方志中心) · p.675
1987-06-25 · 青衣
On 25 June 1987, China Resources proposed merging the two oil depots at Nga Ying Chau and southeast Tsing Yi, pending land grant approval from the Buildings and Lands Department.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1988 · 葵青區 · 日期僅記到年份
In 1988, Kwai Chung and Tsing Yi District was renamed Kwai Tsing District.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.126
1988 · 香港 · 日期僅記到年份
Kwai Chung and Tsing Yi District in Hong Kong was renamed Kwai Tsing District in 1988.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.259
1988 · 香港 · 日期僅記到年份
In 1988, Kwai Tsing District replaced the names of the former Kwai Chung and Tsing Yi Districts, and Yau Tsim District also became the new name for the Yau Ma Tei area.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.258
1988 · 香港 · 日期僅記到年份
In 1988, Kwai Chung and Tsing Yi District was renamed Kwai Tsing District, while Yau Ma Tei District was renamed Yau Tsim District.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.76
1989 · 青衣 · 8月26日
On 26 August 1989, Mobil Oil stated that the Tsing Yi oil depot would be relocated within three years.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989 · 青衣 · 日期僅記到年份
In 1989, the Hong Kong Government imposed restrictions on the storage capacity of the Hong Kong kerosene oil depot for safety reasons, and approached Mobil Oil and Hong Kong Kerosene to discuss the relocation of the depot.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989 · 青衣島 · 2月12日
On 12 February 1989, several district councillors of Tsing Yi Island, together with residents' representatives, held a press conference to urge the authorities to relocate the oil depots from Tsing Yi as soon as possible.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989 · 青衣島 · 2月12日
On 12 February 1989, several residents' organisations in Tsing Yi held an emergency meeting and resolved to hold a sit-in outside the oil depot, raising two demands: public disclosure of evacuation arrangements and relocation of the oil depot away from the area.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989 · 青衣島 · 2月22日
On 22 February 1989, the Secretary for Lands and Works stated that the authorities were exploring the feasibility of relocating the Tsing Yi oil depot to the southern or western part of the island, or other areas of Hong Kong.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989 · 青衣島 · 2月22日
On 22 February 1989, the Secretary for Lands and Works confirmed that several oil depots in Tsing Yi were too close to residential areas, and pointed out that this was a mistake in the Hong Kong Government's town planning.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989 · 青衣島 · 2月22日
On 22 February 1989, the Kwai Tsing District Board voted on a motion, with nine votes in favour and five against, urging the authorities to relocate the oil depots on Tsing Yi Island as soon as possible.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989 · 青衣島 · 3月28日
On 28 March 1989, residents of Tsing Yi Island asked whether gases produced by the operation of the chemical waste plant affected health.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.545
1989-02 · 青衣島 · 日期僅記到月份
In February 1989, the Tsing Yi Concern Group again raised the demand to relocate the oil depot in response to the liquefied petroleum gas leakage incident, and urged the Hong Kong Government to formulate a plan for safely evacuating residents in the event of an accident.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989-02-11 · 青衣島
On 11 February 1989, residents of Mayfair Gardens were evacuated due to an incident, and the Tsing Yi South Bridge was also closed by police and fire services, resulting in no major disaster.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989-02-11 · 青衣島
On 11 February 1989, the Hong Kong oil depot leaked petroleum gas; the depot was located in the southeast of Tsing Yi Island, and the leak was initially suspected to be caused by mechanical failure, with fire services and police attending the scene on standby.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989-04-27 · 青衣
On 27 April 1989, the study report recommended that China Resources' oil depot at Nga Ying Chau be merged with another oil depot also operated by China Resources on the southeastern side of Tsing Yi.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989-04-27 · 青衣
On 27 April 1989, the Secretary for Lands and Works published a study report recommending the relocation of two oil depots in southeast Tsing Yi, operated by Mobil Oil and Hong Kong Oil respectively.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
引用名稱作品 《青衣危險重估研究報告書》(Tsing Yi Hazard Reassessment Study Report)
1989-07 · 青衣島 · 日期僅記到月份
In July 1989, the Tsing Yi Concern Group criticised that the land exchange compensation amounted only to relocation within the island and did not reduce the threat to residents.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989-07 · 青衣 · 日期僅記到月份
In July 1989, Hong Kong and China Oil and China Resources respectively began negotiations with the Hong Kong Government over the relocation of oil depots.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989-07 · 青衣島 · 日期僅記到月份
In July 1989, the Tsing Yi Concern Group proposed that the Hong Kong Government should formulate a long-term plan to address the problems caused by dangerous warehouses.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1989-07 · 青衣島 · 日期僅記到月份
In July 1989, the Hong Kong Government reached an agreement in principle with Mobil Oil on a land exchange arrangement, under which the oil depot in Tsing Yi would be relocated to Area 17 in the southwest of Tsing Yi Island.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1990 · 青衣 · 日期僅記到年份
In 1990, the Hong Kong Government decided to build a chemical waste treatment centre on Tsing Yi at a cost of HK$1.3 billion.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.273
1990 · 葵青區 · 日期僅記到年份
Since the 1990s, Kwai Chung Plaza, Metroplaza, and Maritime Square were successively built, becoming the commercial core of the Kwai Tsing District.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.126
1991 · 青衣 · 日期僅記到年份
The Government intended to build Container Terminal 9 in Tsing Yi, but this was resisted by residents of the district.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.499
1991-12-14 · 香港
On 14 December 1991, 12 representatives of Tsing Yi residents' groups staged a 24-hour hunger strike outside the Government Secretariat to oppose the government's construction of Container Terminal 9 on Tsing Yi.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.500
1991-12-14 · 香港
On 14 December 1991, twelve representatives of Tsing Yi residents' organisations staged a 24-hour hunger strike outside the Government Secretariat.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.499
1991-12-15 · 香港
On 15 December 1991, about 100 Tsing Yi residents held a rally at the site on the day the hunger strike ended to express their protest.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.500
1991-12-15 · 青衣
On 15 December 1991, about 100 Tsing Yi residents held a rally to express opposition to the construction of Container Terminal 9.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.499
1992 · 青衣 · 日期僅記到年份
The Chemical Waste Treatment Centre was completed in 1992 and became fully operational in April 1993, handling chemical waste and marine pollution waste.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.545
1992-12-01 · 青衣島蜆殼油庫
An automatic weather station set up at the Shell oil depot on Tsing Yi Island for measuring wind direction and speed only has been in service since 1 December 1992.
來源 《香港志·自然》自然環境(香港地方志中心) · p.676
1993 · 青衣 · 日期僅記到年份
In 1993, Mobil Oil's new depot at Tsing Yi South opened, and the Hong Kong Kerosene Oil Depot ceased operation in the same year.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1993-04 · 青衣 · 日期僅記到月份
The Chemical Waste Treatment Centre has been in operation since April 1993, with an annual capacity of 100,000 tonnes of chemical waste.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.273
1993-05 · 西部緩衝區 · 日期僅記到月份
From May 1993, the Western Buffer Water Control Zone began to be implemented, covering areas including Tsing Yi, Tsuen Wan and Aberdeen, and the water quality objectives took effect on the same day.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.281
1995 · 青衣 · 3月16日
From 16 March 1995, all chemical waste producers registered in Hong Kong were required to send their chemical waste to the treatment facility in Tsing Yi and pay the relevant charges under the polluter pays principle.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.545
1995 · 香港 · 日期僅記到年份
Stage 1 of the Strategic Sewage Disposal Scheme commenced in 1995, with a collection area covering Kwai Chung and Tsing Yi, as well as the Kowloon Peninsula, Tseung Kwan O, Kwun Tong, and the northeastern part of Hong Kong Island.
來源 《香港志·自然》自然環境(香港地方志中心) · p.583
1995-12 · 青衣 · 日期僅記到月份
In December 1995, Serene Garden, the Hong Kong Housing Society's first Sandwich Class Housing Scheme project, was completed in Tsing Yi and put up for public sale, providing 1,024 units.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.528
1996 · 青衣 · 日期僅記到年份
In 1996, the A Kung Ngam oil depot was relocated to the southeastern tip of Tsing Yi, where it merged with the China Resources oil depot.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.543
1997 · 青衣 · 日期僅記到年份
In 1997, the Tsing Ma Bridge and the Cheung Tsing Bridge were completed and opened.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.125
1997 · 香港 · 日期僅記到年份
In 1997, the Environmental Achievement Award of the Hong Kong Awards for Industry was won by the Tsing Yi oil depot of Mobil Oil Hong Kong Limited.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.602
1997 · 香港 · 日期僅記到年份
This trunk route comprises a dual three-lane carriageway and a two-track railway, connecting Lantau Island, Tsing Yi and Ma Wan.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.541
1997-05-22 · 青衣
On 22 May 1997, the Tsing Yi section, a component of Route 3, officially opened to traffic.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.539
1997-05-30 · 香港
At a meeting of the Legislative Council's environmental panel on 30 May 1997, members indicated they did not support incinerating medical waste at the Tsing Yi Chemical Waste Treatment Centre.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.546
1998 · 青衣 · 日期僅記到年份
The Chemical Waste Treatment Centre recorded one exceedance of dioxin emission limits in November 1998 and another in February 1999, making a cumulative total of two by 2017.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.274
1998 · 青衣 · 日期僅記到年份
The climate averages for Tsing Yi Station are calculated from 1998 to 2020.
來源 《香港志·自然》自然環境(香港地方志中心) · p.678
1998 · 香港 · 日期僅記到年份
The power station in Tsing Yi finally ceased operation in 1998.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.362
1998 · 沙田、荃灣、青衣 · 日期僅記到年份
Since 1998, some aircraft have followed flight paths near Sha Tin, Tsuen Wan and Tsing Yi to align with the runway orientation, causing noise nuisance.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.252
1998 · 青衣 · 日期僅記到年份
In 1998, the Tsing Lai Bridge and the Ting Kau Bridge were completed and opened.
來源 《香港志·自然》建置與地區概況(人口)(香港地方志中心) · p.125
1998-05-06 · 香港
On 6 May 1998, the Ting Kau Bridge section of Route 3 between Tsing Yi and Ting Kau was officially opened to traffic.
來源 《香港志·總述 大事記》(公元前 5000 年至 2017 年,共 6,500 多條大事)(香港地方志中心) · p.562
1998-11 · 青衣 · 日期僅記到月份
The Tsing Yi Chemical Waste Treatment Centre recorded dioxin emissions exceeding the legal standard in November 1998, and again recorded a similar exceedance in February 1999.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.546
1999 · 青衣 · 日期僅記到年份
In 1999, those attending the meeting expressed dissatisfaction with the Government's delay in disclosing that dioxin emissions exceeded the standard, and unanimously opposed the disposal of medical waste at the Tsing Yi Chemical Waste Treatment Centre.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.546
1999 · 青衣 · 日期僅記到年份
To avoid emissions exceeding the standard again, the centre concerned installed treatment equipment for dioxins in exhaust gas after the incident.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.274
1999 · 青衣 · 日期僅記到年份
In 1999, the authorities said they would improve the incineration of medical waste at the Tsing Yi Chemical Waste Treatment Centre through regulatory and management measures, and did not respond on whether it would be relocated.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.546
1999 · 青衣 · 日期僅記到年份
In 1999, participants said that the incineration of medical waste would emit carcinogenic and toxic substances such as dioxins and mercury, and therefore demanded that the SAR Government relocate the Tsing Yi Chemical Waste Treatment Centre to another location.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.546
1999-05-13 · 青衣
On 13 May and 22 July 1999, the Kwai Tsing Provisional District Council held meetings on the handling of medical waste at the Tsing Yi Chemical Waste Treatment Centre and on dioxin emissions respectively.
來源 《香港志·自然》環境保護與生態保育(香港地方志中心) · p.546
1999-08-24 · 青衣路
On 24 August 1999, a landslide occurred on Tsing Yi Road, with a volume of 1,000 cubic metres of debris.
來源 《香港志·自然》自然環境(香港地方志中心) · p.696
呢一期條目引用 4 個已登記來源(一律《香港志》電子書同官方刊物本身,唔會引用二手轉述)。
Auto Chat
只從已核對條目作答,不發明數字。